施工年月 所在地 工事項目 施設用途
2023 Shizuoka Commercial Car
466,000 units/year
  • New Paint Shop Sealer UBC Spray Robot System
  • Robot / Paint Supply System
2023 Gunma Commercial Car
436,000 units/year
  • No.3 Paint Shop Paint Robot System
  • Robot
2023 Gunma Auto Parts
240,000 units/year
  • New Electrodeposition Coating Line
  • Pretreatment / ED-Coat / Ovens / Working Area / Robot / Conveyor / Exhaust Air Treatment / Central Control System
2023 Gunma Passenger Car
  • Renewal of Odor Diffusion Equipment for Booths
  • Exhaust Air Treatment
2023 Shizuoka Passenger Car
262,000 units/year
  • Carbon Neutral Measures
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Exhaust Air Treatment
2023 Gifu Passenger Car
52,000 units/year
  • Topcoat Line Renewal
  • Ovens / Booth / Air-conditioning
2022 Shizuoka Passenger Car
300,500 units/year
  • New Paint Shop
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Exhaust Air Treatment / Fire Fighting System
2022 Kanagawa Passenger Car
3,840 units/year
  • Paint Equipment
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Conveyor
2022 Shizuoka Outboard Motor
200,000 units/year
  • New Paint Line
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area
2022 Gunma Passenger Car
  • Modification of Air Conditioning Systems
  • Air-conditioning / Utility
2022 Gunma Passenger Car
300,000 units/year
  • Robot System for No.1 Clear Coat
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System
2022 Gunma Passenger Car
300,000 units/year
  • Robot System for No.2 Base Coat
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System
2021 Gunma Passenger Car
240,000/unit/year 2 shift
  • Robot System for Primer Coat
  • Booth / Robot
2021 Gunma Passenger Car
240,000/unit/year 2 shift
  • Robot System for No.1 Base Coat
  • Booth / Robot
2021 Kanagawa Passenger Car
170,000 units/year 2shift
  • Renewal
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Exhaust Air Treatment / Central Control System
2021 Kanagawa Axle
200,000 units/year 2shift
  • Renewal
  • Ovens / Booth / Robot / Paint Supply System / Fire Fighting System
2021 Mie Auto Parts
100,000 hanger/year 2shift
  • Parts ED Line
  • Pretreatment / ED-Coat / Ovens
2021 Yamaguchi Passenger Car
138,000 units/year 2shift
  • Flash-Off Installation
  • Ovens / Booth / Air-conditioning
2021 Osaka Frame
100,000 carrier/year 2shift
  • Oven and RTO Renewal
  • Ovens / Exhaust Air Treatment
2020 Mie Auto Plastic Parts
208,000 Carrier/Year
  • Resin Parts Paint New Line
  • Ovens / Booth / Air-conditioning / Working Area / Robot
2020 Yamaguchi Passenger Car
150,000 units/year
  • Booth / Air-conditioning /
2020 Shiga Auto Plastic Parts
320,000 Carrier/Year
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Fire Fighting System / Utility /
2020 Gunma 30JPH
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor
2019 Gunma Passenger Car
250000
  • Booth / Air-conditioning / Working Area
2019 Shiga Bumper
60JPH
  • Ovens / Booth / Air-conditioning / Paint Supply System / Exhaust Air Treatment
2018 Shizuoka Passenger Car
150000
  • Robot
2018 Gunma Bumper
250000
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment
2017 Ibaraki Construction Machinery
11,000 units/year
  • New Paint Shop
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Fire Fighting System / Central Control System
2017 Shizuoka Motorcycle
136,000 units/year 2shift
  • New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Conveyor / Exhaust Air Treatment
2017 Aichi Mini Van
200,000 units/year 2shift
  • New ED Line
  • Pretreatment / ED-Coat / Ovens / Exhaust Air Treatment
2016 Shizuoka Passenger Car
240,000 units/year
  • Robot Modification
2016 Gifu Parts
  • New Paint Line
  • Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor / Central Control System / Waste Water Treatment / Utility / Building
2016 Hiroshima Passenger Car
240,000 units/year
  • Booth / Air-conditioning
2016 Oita Bumper
120,000 units/year
  • New Plastic Line
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Exhaust Air Treatment
2016 Aichi Aircraft
10 units/month
  • New Paint Line
  • Ovens / Booth / Air-conditioning

北米

この表は横にスクロールが可能です
施工年月 所在地 工事項目 施設用途
2023 US Motorcycle
(150 Parts Per Day)
  • Robotic Paint Cell
2023 US Automotive
(75 JPH)
  • CO2 Blow-off Automation
2023 US Automotive
(40 JPH)
  • Automated Skiving & Sealer Application
2023 US Heavy Truck
  • Booth Modification
2023 US Automotive
(10,000 JPW)
  • PTED Conveyor Chain Replacement
2023 US Automotive
(10,000 JPW)
  • Paint Hospital Booths
2023 US Battery Manufacturing
  • Heat Recovery Equipment, Ductwork, Platforms
2023 US Automotive
  • Piggable Paint Supply System
2023 US Automotive (60 JPH)
  • New PTED System, E-Coat Ovens, Work Decks, Exhaust Air Treatment
2022 US Automotive (35 JPH)
  • Work Deck & Conveyor Extension
2022 US Commercial Van (18 JPH)
  • Repair Deck Upgrades
2022 US Automotive
(250,000 JPY)
  • Turn-Key New Paint Shop
2021 US Automotive
(350,000 JPY)
  • New RTO Exhaust Air Treatment
2021 US Automotive
(25,000 JPY)
  • New RTO Exhaust Air Treatment
2021 US Aviation
(1,200 PPY)
  • Automated Paint Application, New Paint Supply System
2021 US Automotive (Powertrain)
(260,000 JPY)
  • Automation Upgrades
2020 US Automotive
(50,000 JPY)
  • New Paint Spray Booths, Dry Filter Scrubber
2020 US Automotive
  • EV Related Oven Upgrades
2020 US Heavy Truck
(50,000 JPY)
  • Turn-Key New Paint Shop
2020 US Automotive
(60,000 JPY)
  • Automation Integration
2019 US Heavy Truck
  • Air-conditioning / Exhaust Air Treatment / Utility /
2019 US Fascia & Plastic Parts (100 JPH)
  • Turn-Key New Paint Shop
2019 US Automotive
(48 JPH)
  • Automated Paint Application
2019 US Automotive
(48 JPH)
  • Automated Powder Paint Application
2019 US Automotive
(25 JPH)
  • Automated Paint Application
2019 US Automotive
(48 JPH)
  • Automated Paint Application
2018 US Automotive
(300,000 JPH)
  • New PTED System, ED & Top Coat Ovens
2018 US Automotive
  • New Ovens, Paint Spray Booths, Air Conditioning
2017 US Aviation
  • Robotic Parts Painting
2017 US Aviation
  • Robotic Coating System
2017 US Avaiation
  • Robotic Parts Painting
2017 US Automotive
(340,000 JPY)
  • Oven Extension for Capacity Increase
2017 US Parts Production
  • Automation Replacement
2017 US Battery Panels
  • Automated Powder Coat Application
2017 US Automotive
(240,000 JPY)
  • Automation System Upgrades
2017 CANADA Fascia Paint
(225,000 JPY)
  • New Paint Spray Booths, Dry Filter Scrubber
2017 CANADA Automotive
  • New Booths, Ovens, Air Handling Units, Fire Protection & Controls
2017 CANADA Automotive
(200,000 JPY)
  • Automated Powder Paint Application
2017 CANADA Automotive
(200,000 JPY)
  • New Sealer Automation
2016 US Automotive
  • Automation Upgrades
2016 US Aviation
  • Automation Upgrades & Booth Equipment
2016 US Automotive
  • Turn-Key New Paint Shop

中国

この表は横にスクロールが可能です
施工年月 所在地 工事項目 施設用途
2023 Guangdong Passenger Car
240,000 unit/year
  • Paint Facility Modification
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Exhaust Air Treatment / Central Control System
2023 Liaoning Toilet Bowl
116.4 work/hr
  • New Factory
  • Ovens / Air-conditioning
2023 Sichuan Passenger Car
50,000 unit/year
  • Booth Modification
  • Booth / Air-conditioning
2023 Hubei Passenger Car
120,000 unit/year
  • 3C2B Modification
  • Ovens / Booth / Air-conditioning / Working Area / Robot
2023 Guangdong Passenger Car
200,000 unit/year
  • Paint Facility Modification
  • Working Area
2023 Changchun Passenger Car
200,000 unit/year
  • Paint Facility Modification
  • Booth / Air-conditioning
2023 Guangdong Passenger Car
240,000 unit/year
  • 3C2B Modification
  • Booth / Air-conditioning
2023 Guangdong Passenger Car
240,000 unit/year
  • VOC Supply
  • Exhaust Air Treatment
2023 Guangdong Passenger Car
200,000 unit/year
  • Change to Dry Booth
  • Booth
2022 Hubei New Energy Vehicle
120,000 units/year
  • Plant Renewal
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System
2022 Guangzhou New Energy Vehicle
200,000 units/year
  • Expansion
  • Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Exhaust Air Treatment / Central Control System
2022 Guangzhou New Energy Vehicle
120,000 units/year
  • Top Coat Robot for New Plant
  • Robot
2022 Hubei New Energy Vehicle
50,000 units/year
  • New Paint Shop
  • Ovens / Booth / Air-conditioning / Working Area / Exhaust Air Treatment / Central Control System
2022 Guangzhou New Energy Vehicle
200,000 units/year
  • Expansion
  • Booth / Air-conditioning / Working Area / Exhaust Air Treatment
2022 Guangzhou New Energy Vehicle
65,000 units/year
  • Top Coat Robot Renewal
  • Robot / Paint Supply System
2022 Hubei Passenger Car
240,000 units/year
  • Modification
  • Booth / Air-conditioning
2022 Guangzhou Passenger Car
240,000 units/year
  • Modification
  • Booth / Air-conditioning
2022 Guangzhou Passenger Car
260,000 units/year
  • Clear Robot Renewal
  • Robot / Paint Supply System
2022 Guangzhou Passenger Car
240,000 units/year
  • Robot Renewal
  • Robot
2022 Guangzhou Passenger Car
200,000 units/year
  • Robot Renewal
  • Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor
2022 Guangzhou Passenger Car
270,000 units/year
  • Exhaust Air Treatment
2022 Hubei Passenger Car
240,000 units/year
  • Exhaust Air Treatment
2022 Hubei New Energy Vehicle
200,000 units/year
  • Exhaust Air Treatment
2021 Jiangsu New Energy Vehicle
100,000 units/year 2shift
  • Robot System for New Paint Shop
  • Robot
2021 Hubei Passenger Car
240,000 units/year 2shift
  • Bumper Painting Robot Replacement(Base & Clear)
  • Booth / Robot / Paint Supply System
2021 Hubei Passenger Car
Truck
240,000 units/year 2shift
  • PA Primer Painting Robot Replacement
  • Robot / Paint Supply System
2021 Tianjin Passenger Car
100,000units/year
  • Existing plant modification
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Conveyor / Central Control System
2021 Jilin Passenger Car
200,000units/year
  • Booth Exhaust VOC Treatment
  • Exhaust Air Treatment
2021 Henan Large Bus
33,000units/year
  • Booth Exhaust VOC Treatment
  • Exhaust Air Treatment
2021 Hubei Passenger Car
200,000units/year
  • Booth Exhaust VOC Treatment
  • Exhaust Air Treatment
2021 Guangdong Passenger Car
200,000units/year
  • Sealer Automation
  • Working Area / Robot
2021 Hubei Passenger Car
180,000units/year
  • Booth exhaust VOC treatment
  • Exhaust Air Treatment
2020 Wuhan City, Hubei Passenger Car
240,000 unit/year
  • PA#2 B-Line
  • Base Outer Painting Robot Renewal
  • Robot / Paint Supply System /
2020 Wuhan City, Hubei Passenger Car
300,000 unit/year
  • Paint Quality Inspection & Automatic measurement Equipment /Robot /
2020 Guangzhou City, Guangdong Passenger Car
240,000 unit/year
  • Zengcheng PA#2
  • Intermediate Coating Robot Renewal
  • Robot / Paint Supply System /
2020 Guangzhou New Energy Vehicle
100,000 units/year, 2 shifts
  • Booth / Air-conditioning / Working Area / Fire Fighting System /
2019 Chengdu Passenger Car
25JPH
  • Booth / Air-conditioning
2019 Wuhan Passenger Car
52JPH
  • Booth / Air-conditioning / Robot /
2019 Wuhan Passenger Car
20JPH
  • Ovens / Booth / Air-conditioning / Working Area /Robot
2019 Guangzhou
Guangdong
Passenger Car
200,000 units/year
  • Booth/Oven/Work Area/Exhaust Air Treatment
2018 Dalian Passenger Car
60JPH
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System
2018 Guangzhou Passenger Car
60JPH
  • Exhaust Air Treatment
2018 Anhui
Hefei

Construction machinery
  • Booth / Air-conditioning / Exhaust Air Treatment
2018 Changzhou Passenger Car
  • Booth / Air-conditioning / Robot
2018 Wuhan Passenger Car
256000/year
  • Robot
2018 Guangzhou Passenger Car
240000/year
  • Robot
2018 Guangzhou Passenger Car
180000/year
  • Robot
2018 Guangzhou Passenger Car
180000/year
  • Robot
2018 Changzhou Passenger Car
156000/year
  • Robot
2018 Zhengzhou Passenger Car
180000/year
  • Robot
2018 Zhengzhou Passenger Car
135000/year
  • Robot
2018 Wuhan
Hubei
Passenger Car
300,000 units/year
  • Full Turn Key(Except for PCS and ROBOT)
2017 Tianjin Passenger Car
160,000 units/year 2shift
  • Water-borne Paint Robot Modification
  • Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System / Utility
2017 Guangzhou New Energy Vehicle
100,000 units/year 2shift
  • New Paint Shop
  • Ovens / Booth / Air-conditioning / Conveyor / Exhaust Air Treatment / Central Control System
2017 Fuzhou
Fujian
Passenger Car
50,000 units/year 2shift
  • Water-borne Paint Modification
  • Paint Supply System
2017 Wuhan
Hubei
Passenger Car
120,000 units/year
  • Paint Shop Expansion
  • Robot
2017 Wuhan
Hubei
Passenger Car
240,000 units/year
  • Robot Modification
  • Robot
2017 Nanjing
Jiangsu
Passenger Car
200,000 units/year 2shift
  • VOC Modification
  • Booth / Air-conditioning / Exhaust Air Treatment
2017 Xiangyang
Hubei
Passenger Car
180,000 units/year 2shift
  • Expansion
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System
2017 Zhengzhou
Henan
Passenger Car
240,000 units/year
  • 3C1B Modification
  • Robot
2017 Zhengzhou
Henan
Passenger Car
240,000 units/year
  • 3C1B Modification
  • Robot
2016 Guangzhou Passenger Car
100,000 units/year
  • Working Area
2016 Guangzhou Passenger Car
240,000 units/year
  • Robot Modification
2016 Zhejiang Passenger Car
200,000 units/year
  • New Paint Line
  • Ovens / Booth / Air-conditioning / Conveyor / Exhaust Air Treatment / Central Control System
2016 Shenyang Passenger Car
130,000 units/year
  • 3C1B modification
  • Booth / Robot
2016 Guangzhou Passenger Car
240,000 units/year
  • Robot Modification
2016 Tianjin Passenger Car
150,000 units/year
  • Waterborne modification
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System
2016 Guangzhou Bumper
150,000 units/year
  • Robot Modification
2016 Henan Passenger Car
280,000 units/year
  • Modification
  • Booth / Robot

インド

この表は横にスクロールが可能です
施工年月 所在地 工事項目 施設用途
2023 Uttar Pradesh Vande Bharat Train Coach
1000 nos./Year
  • Infrastructure Requirement for Series Production of Train S
2023 Haryana Bumper
Bumper , Splash guard , Extension 280,000 vehicles/year
  • Painting Equipment B-Line
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Exhaust Air Treatment / Fire Fighting System
2023 Maharashtra Forklift
10,000 Unit / Year
  • New Liquid Painting Line For MHE
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Fire Fighting System / Central Control System
2023 Maharashtra Passenger Car
400,000 Unit / Year
  • PT-CED Conveyor Connectivity
  • Conveyor
2023 Maharashtra Passenger Car
180,000 Unit/ year
  • Primer & Clear Coat Painting Robot Replaceme
2022 Haryana Passenger Car
255,000 units/year
  • New Paint B Line Body Paint Project
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Exhaust Air Treatment / Fire Fighting System
2022 Hyderabad Train Wagon
1000Unit/Year
  • Wagon Repair Workshop
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Utility
2022 Vadodara Memu Coach
  • Expansion phase-II of Pratapnagar workshop
  • Working Area
2022 Bhubaneswar LHB Coaches
  • Composite Works at CRW
  • Mancheshwar
  • Working Area
2022 Andhra Pradesh Compressor
3,000,000 units/year
  • PT-ED Line For Compressor
  • Pretreatment / ED-Coat / Ovens / Working Area / Conveyor
2022 Punjab Tractor Chassis
70,000 Unit/year
  • Tractor Chassis Painting Facility
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Conveyor
2022 Pune Passenger Car
200,000 units/year
  • Trim 1 & Trim 2 Skillet Conveyor
  • Conveyor
2022 Pune Passenger Car
42,000 car sets/year
  • Oil Conservation Plant For 4W
  • Pretreatment / Ovens / Conveyor / Central Control System
2021 Maharashtra Passenger Car
200,000 units/year 3shifts
  • WBS & PBS Automated Storage Retrieval System Installation
  • Conveyor
2021 Maharashtra Passenger Car
200,000 units/year 3shifts
  • Capacity expansion
  • Pretreatment / Ovens / Booth
2019 Haryana Tractor
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor / Fire Fighting System / Central Control System / Utility /
2019 Madhya Pradesh Truck Cabin
  • Conveyor
2019 Haryana Railway
  • Ovens / Booth / Air-conditioning / Utility
2019 Maharashtra Railway
  • Ovens / Booth / Air-conditioning / Utility
2019 Haryana Parts
400,000 unit/Year
  • Ovens / Booth / Air-conditioning / Working Area / Fire Fighting System / Central Control System / Robot/ Paint Supply System
2019 Madhya Pradesh Tractor
Sheet metal
100,000 unit/Year
  • Pretreatment / ED-Coat / Ovens / Working Area / Conveyor / Utility /
2019 Tamil Nadu Parts
  • Ovens /Cardboad filter Booth / Air-conditioning / Working Area / Fire Fighting System / Paint Supply System
2018 Gujarat Passenger Car
250000
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine/ Robot
2018 Gujarat Passenger Car
250,000 body/Year
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Exhaust Air Treatment / Fire Fighting System /
2018 Tamil Nadu Elevator Parts
360,000 unit/Year
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Conveyor / Utility /
2018 Tamil Nadu Parts
50,000 unit/Year
  • Ovens / Booth / Air-conditioning / Working Area / Fire Fighting System /
2018 Gujarat Parts
  • Booth/ Oven/ Conveyor/ Air-conditioning/ Paint Supply System
2017 Gujarat Alloy Wheel
1,430,000 units/year
  • New Paint Shop for Alloy wheel
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Conveyor / Fire Fighting System / Utility
2017 Chennai
Tamil Nadu
Parts
875,400 hanger/year
  • Plastic Painting Line
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Conveyor / Fire Fighting System
2017 Chennai
Tamil Nadu
Motorcycle
700 nos/day
  • Robot Installation Phase1
  • Robot
2017 Gujarat Passenger Car
250,000 units/year
  • Robot Installation
  • Pretreatment / ED-Coat / Ovens / Booth / Robot
2017 Visakhapatnam Wagon
  • Periodic Over Haul
  • Ovens / Booth / Air-conditioning / Paint Supply System / Fire Fighting System / Utility / Building
2016 Gujarat Passenger Car
250,000 units/year
  • New Paint Line
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Exhaust Air Treatment / Fire Fighting System
2016 Bihar Diesel Locomotive
100 units/year
  • Paint Booth
  • Ovens / Booth / Air-conditioning

東南アジア

この表は横にスクロールが可能です
施工年月 所在地 工事項目 施設用途
2023 Thailand Motorcycle
100,000 units/year
  • New Painting Line (Solvent)
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Fire Fighting System / Central Control System
2023 Indonesia Bed Frame
520HG/Day
  • New Painting Line
  • Pretreatment / ED-Coat / Ovens / Booth / Auto Spray Machine / Conveyor / Waste Water Treatment / Utility
2022 Thailand Motorcycle Parts
612Hanger/Day
  • New ABS Painting Line
  • Ovens / Booth / Robot / Paint Supply System / Conveyor
2022 Indonesia Passenger Car
200,000 units/year
  • New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Auto Spray Machine / Robot / Waste Water Treatment / Utility
2022 Indonesia A/C Parts
1,100,000 Unit/Year
  • New Powder Coat Line
  • Pretreatment / Ovens / Booth / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Central Control System / Waste Water Treatment / Utility
2021 Thailand Motorcycle Parts
27.1sec/Hg
  • New PO1 Painting Line
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System
2021 Thailand Pickup Truck
180,000 units/year 2shift
  • GW Factory Capacity up
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System
2021 Malaysia Autos&Bumper
50,000 units/year 2shift
  • New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Fire Fighting System / Central Control System / Utility
2020 Cambodia Motorcycle (Honda)
200,000 units/year
  • Pretreatment / ED-Coat / Ovens / Conveyor
2020 Myanmar Passenger Car
50,000 units/year
  • Pretreatment / ED-Coat / Ovens / Conveyor
2019 Thailand TRUCK CAB
25,164Unit/Year
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor /
2019 Thailand METAL PARTS OF CONDENSING UNIT
566,500Hg/Year
  • Pretreatment / Ovens / Booth / Air-conditioning / Conveyor /
2019 Thailand THERMOS BOTTLE
3,240,000Pcs/Year
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Conveyor /
2018 Thailand FRAME FOR MOTORCYCLE
210sec/Hg
  • Pretreatment / Ovens / Booth / Air-conditioning / Conveyor / Waste Water Treatment /
2017 Thailand Motorcycle
  • New ED Line
  • Pretreatment / ED-Coat / Ovens / Air-conditioning / Working Area / Conveyor
2017 Thailand Plastic Prats
  • New Painting Line
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor
2016 Thailand Passenger Car
15,000 units/year
  • New Paint Line
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Fire Fighting System / Central Control System / Waste Water Treatment
2016 Malaysia Passenger Car
50,000 units / year
  • New Paint Line
  • Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Exhaust Air Treatment
2016 Philppine Passenger Car
50,000 units/year
  • Modification
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System
2016 Thailand Farm Machinery
10,000 units/year
  • New Paint Line
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor

欧州

この表は横にスクロールが可能です
施工年月 所在地 工事項目 施設用途
2023 Egypt Train Maintenance
  • Phase 1 project
  • Working Area
2023 Hungary Passenger Car
280,000 units/year
  • Under Body Coat Sealer Robot
  • Robot
2023 Hungary Bumper
280,000 units/year
  • Primer Robot Replacement
  • Robot
2016 Russia Passenger Car
22,000 units/year
  • New Paint Shop Project
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Fire Fighting System / Utility

南米

この表は横にスクロールが可能です
施工年月 所在地 工事項目 施設用途
2023 Mexico Truck Cabin
360 job/day
  • New Paint Line Full Turn Key Project
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor / Exhaust Air Treatment / Fire Fighting System / Central Control System / Utility / Build
2022 Mexico Passenger Car
  • Dolly Storage Expansion
  • Conveyor
2020 Mexico Truckbed
200,000/year
  • New Paint Shop
  • Pretreatment / ED-Coat /Ovens / Booth / Air-conditioning / Working Area / Exhaust Air Treatment / Paint Supply System / Conveyor
2020 Brazil Motorcycle
  • New ABS Line
2018 Mexico Passenger Car
100,000/year
  • Ovens / Booth / Air-conditioning / Working Area / Exhaust Air Treatment /
2016 Mexico Pick-up Trucks
70,000 units/year
  • Expansion
  • Pretreatment / ED-Coat / Ovens / Air-conditioning / Paint Supply System
2016 Brazil Passenger Car
108,000 units/year
  • Expansion
  • Ovens / Booth / Working Area
2016 Brazil Passenger Car
  • New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Fire Fighting System / Central Control System

その他地域

この表は横にスクロールが可能です
施工年月 所在地 工事項目 施設用途
2022 Korea EV
150,000 units/year
  • Modification for EV Production
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Conveyor / Central Control System
2022 Korea Truck
100,000 units/year
  • Modification of Paint Working Area
  • Working Area
2022 Korea Vehicle
300,000 units/year
  • Modification of PT,ED
  • Pretreatment / ED-Coat
2020 Korea Passenger Car
100,000 units/year
  • Gwangju Global Motors New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Working Area / Exhaust Air Treatment / Utility /
2019 Taiwan Passenger Car
40,000 units/year
  • S/B