Construction results

Taikisha boasts many years of experience and a proven track record in the design, manufacture, and installation of painting equipment. We meet the diverse needs of our customers by providing painting equipment for the automotive industry and various other industrial fields.

Search by area

*Click an area name to display country-specific figures.

Japan

This table can be scrolled horizontally
Construction date Location Items Facility usage
2023 Shizuoka Commercial Car
466,000 units/year
  • New Paint Shop Sealer UBC Spray Robot System
  • Robot / Paint Supply System
2023 Gunma Commercial Car
436,000 units/year
  • No.3 Paint Shop Paint Robot System
  • Robot
2023 Gunma Auto Parts
240,000 units/year
  • New Electrodeposition Coating Line
  • Pretreatment / ED-Coat / Ovens / Working Area / Robot / Conveyor / Exhaust Air Treatment / Central Control System
2023 Gunma Passenger Car
  • Renewal of Odor Diffusion Equipment for Booths
  • Exhaust Air Treatment
2023 Shizuoka Passenger Car
262,000 units/year
  • Carbon Neutral Measures
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Exhaust Air Treatment
2023 Gifu Passenger Car
52,000 units/year
  • Topcoat Line Renewal
  • Ovens / Booth / Air-conditioning
2022 Shizuoka Passenger Car
300,500 units/year
  • New Paint Shop
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Exhaust Air Treatment / Fire Fighting System
2022 Kanagawa Passenger Car
3,840 units/year
  • Paint Equipment
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Conveyor
2022 Shizuoka Outboard Motor
200,000 units/year
  • New Paint Line
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area
2022 Gunma Passenger Car
  • Modification of Air Conditioning Systems
  • Air-conditioning / Utility
2022 Gunma Passenger Car
300,000 units/year
  • Robot System for No.1 Clear Coat
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System
2022 Gunma Passenger Car
300,000 units/year
  • Robot System for No.2 Base Coat
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System
2021 Gunma Passenger Car
240,000/unit/year 2 shift
  • Robot System for Primer Coat
  • Booth / Robot
2021 Gunma Passenger Car
240,000/unit/year 2 shift
  • Robot System for No.1 Base Coat
  • Booth / Robot
2021 Kanagawa Passenger Car
170,000 units/year 2shift
  • Renewal
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Exhaust Air Treatment / Central Control System
2021 Kanagawa Axle
200,000 units/year 2shift
  • Renewal
  • Ovens / Booth / Robot / Paint Supply System / Fire Fighting System
2021 Mie Auto Parts
100,000 hanger/year 2shift
  • Parts ED Line
  • Pretreatment / ED-Coat / Ovens
2021 Yamaguchi Passenger Car
138,000 units/year 2shift
  • Flash-Off Installation
  • Ovens / Booth / Air-conditioning
2021 Osaka Frame
100,000 carrier/year 2shift
  • Oven and RTO Renewal
  • Ovens / Exhaust Air Treatment
2020 Mie Auto Plastic Parts
208,000 Carrier/Year
  • Resin Parts Paint New Line
  • Ovens / Booth / Air-conditioning / Working Area / Robot
2020 Yamaguchi Passenger Car
150,000 units/year
  • Booth / Air-conditioning /
2020 Shiga Auto Plastic Parts
320,000 Carrier/Year
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Fire Fighting System / Utility /
2020 Gunma 30JPH
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor
2019 Gunma Passenger Car
250000
  • Booth / Air-conditioning / Working Area
2019 Shiga Bumper
60JPH
  • Ovens / Booth / Air-conditioning / Paint Supply System / Exhaust Air Treatment
2018 Shizuoka Passenger Car
150000
  • Robot
2018 Gunma Bumper
250000
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment
2017 Ibaraki Construction Machinery
11,000 units/year
  • New Paint Shop
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Fire Fighting System / Central Control System
2017 Shizuoka Motorcycle
136,000 units/year 2shift
  • New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Conveyor / Exhaust Air Treatment
2017 Aichi Mini Van
200,000 units/year 2shift
  • New ED Line
  • Pretreatment / ED-Coat / Ovens / Exhaust Air Treatment
2016 Shizuoka Passenger Car
240,000 units/year
  • Robot Modification
2016 Gifu Parts
  • New Paint Line
  • Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor / Central Control System / Waste Water Treatment / Utility / Building
2016 Hiroshima Passenger Car
240,000 units/year
  • Booth / Air-conditioning
2016 Oita Bumper
120,000 units/year
  • New Plastic Line
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Exhaust Air Treatment
2016 Aichi Aircraft
10 units/month
  • New Paint Line
  • Ovens / Booth / Air-conditioning

North America

North America

This table can be scrolled horizontally
Construction date Location Items Facility usage
2023 US Motorcycle
(150 Parts Per Day)
  • Robotic Paint Cell
2023 US Automotive
(75 JPH)
  • CO2 Blow-off Automation
2023 US Automotive
(40 JPH)
  • Automated Skiving & Sealer Application
2023 US Heavy Truck
  • Booth Modification
2023 US Automotive
(10,000 JPW)
  • PTED Conveyor Chain Replacement
2023 US Automotive
(10,000 JPW)
  • Paint Hospital Booths
2023 US Battery Manufacturing
  • Heat Recovery Equipment, Ductwork, Platforms
2023 US Automotive
  • Piggable Paint Supply System
2023 US Automotive (60 JPH)
  • New PTED System, E-Coat Ovens, Work Decks, Exhaust Air Treatment
2022 US Automotive (35 JPH)
  • Work Deck & Conveyor Extension
2022 US Commercial Van (18 JPH)
  • Repair Deck Upgrades
2022 US Automotive
(250,000 JPY)
  • Turn-Key New Paint Shop
2021 US Automotive
(350,000 JPY)
  • New RTO Exhaust Air Treatment
2021 US Automotive
(25,000 JPY)
  • New RTO Exhaust Air Treatment
2021 US Aviation
(1,200 PPY)
  • Automated Paint Application, New Paint Supply System
2021 US Automotive (Powertrain)
(260,000 JPY)
  • Automation Upgrades
2020 US Automotive
(50,000 JPY)
  • New Paint Spray Booths, Dry Filter Scrubber
2020 US Automotive
  • EV Related Oven Upgrades
2020 US Heavy Truck
(50,000 JPY)
  • Turn-Key New Paint Shop
2020 US Automotive
(60,000 JPY)
  • Automation Integration
2019 US Heavy Truck
  • Air-conditioning / Exhaust Air Treatment / Utility /
2019 US Fascia & Plastic Parts (100 JPH)
  • Turn-Key New Paint Shop
2019 US Automotive
(48 JPH)
  • Automated Paint Application
2019 US Automotive
(48 JPH)
  • Automated Powder Paint Application
2019 US Automotive
(25 JPH)
  • Automated Paint Application
2019 US Automotive
(48 JPH)
  • Automated Paint Application
2018 US Automotive
(300,000 JPH)
  • New PTED System, ED & Top Coat Ovens
2018 US Automotive
  • New Ovens, Paint Spray Booths, Air Conditioning
2017 US Aviation
  • Robotic Parts Painting
2017 US Aviation
  • Robotic Coating System
2017 US Avaiation
  • Robotic Parts Painting
2017 US Automotive
(340,000 JPY)
  • Oven Extension for Capacity Increase
2017 US Parts Production
  • Automation Replacement
2017 US Battery Panels
  • Automated Powder Coat Application
2017 US Automotive
(240,000 JPY)
  • Automation System Upgrades
2017 CANADA Fascia Paint
(225,000 JPY)
  • New Paint Spray Booths, Dry Filter Scrubber
2017 CANADA Automotive
  • New Booths, Ovens, Air Handling Units, Fire Protection & Controls
2017 CANADA Automotive
(200,000 JPY)
  • Automated Powder Paint Application
2017 CANADA Automotive
(200,000 JPY)
  • New Sealer Automation
2016 US Automotive
  • Automation Upgrades
2016 US Aviation
  • Automation Upgrades & Booth Equipment
2016 US Automotive
  • Turn-Key New Paint Shop

China

This table can be scrolled horizontally
Construction date Location Items Facility usage
2023 Guangdong Passenger Car
240,000 unit/year
  • Paint Facility Modification
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Exhaust Air Treatment / Central Control System
2023 Liaoning Toilet Bowl
116.4 work/hr
  • New Factory
  • Ovens / Air-conditioning
2023 Sichuan Passenger Car
50,000 unit/year
  • Booth Modification
  • Booth / Air-conditioning
2023 Hubei Passenger Car
120,000 unit/year
  • 3C2B Modification
  • Ovens / Booth / Air-conditioning / Working Area / Robot
2023 Guangdong Passenger Car
200,000 unit/year
  • Paint Facility Modification
  • Working Area
2023 Changchun Passenger Car
200,000 unit/year
  • Paint Facility Modification
  • Booth / Air-conditioning
2023 Guangdong Passenger Car
240,000 unit/year
  • 3C2B Modification
  • Booth / Air-conditioning
2023 Guangdong Passenger Car
240,000 unit/year
  • VOC Supply
  • Exhaust Air Treatment
2023 Guangdong Passenger Car
200,000 unit/year
  • Change to Dry Booth
  • Booth
2022 Hubei New Energy Vehicle
120,000 units/year
  • Plant Renewal
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System
2022 Guangzhou New Energy Vehicle
200,000 units/year
  • Expansion
  • Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Exhaust Air Treatment / Central Control System
2022 Guangzhou New Energy Vehicle
120,000 units/year
  • Top Coat Robot for New Plant
  • Robot
2022 Hubei New Energy Vehicle
50,000 units/year
  • New Paint Shop
  • Ovens / Booth / Air-conditioning / Working Area / Exhaust Air Treatment / Central Control System
2022 Guangzhou New Energy Vehicle
200,000 units/year
  • Expansion
  • Booth / Air-conditioning / Working Area / Exhaust Air Treatment
2022 Guangzhou New Energy Vehicle
65,000 units/year
  • Top Coat Robot Renewal
  • Robot / Paint Supply System
2022 Hubei Passenger Car
240,000 units/year
  • Modification
  • Booth / Air-conditioning
2022 Guangzhou Passenger Car
240,000 units/year
  • Modification
  • Booth / Air-conditioning
2022 Guangzhou Passenger Car
260,000 units/year
  • Clear Robot Renewal
  • Robot / Paint Supply System
2022 Guangzhou Passenger Car
240,000 units/year
  • Robot Renewal
  • Robot
2022 Guangzhou Passenger Car
200,000 units/year
  • Robot Renewal
  • Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor
2022 Guangzhou Passenger Car
270,000 units/year
  • Exhaust Air Treatment
2022 Hubei Passenger Car
240,000 units/year
  • Exhaust Air Treatment
2022 Hubei New Energy Vehicle
200,000 units/year
  • Exhaust Air Treatment
2021 Jiangsu New Energy Vehicle
100,000 units/year 2shift
  • Robot System for New Paint Shop
  • Robot
2021 Hubei Passenger Car
240,000 units/year 2shift
  • Bumper Painting Robot Replacement(Base & Clear)
  • Booth / Robot / Paint Supply System
2021 Hubei Passenger Car
Truck
240,000 units/year 2shift
  • PA Primer Painting Robot Replacement
  • Robot / Paint Supply System
2021 Tianjin Passenger Car
100,000units/year
  • Existing plant modification
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Conveyor / Central Control System
2021 Jilin Passenger Car
200,000units/year
  • Booth Exhaust VOC Treatment
  • Exhaust Air Treatment
2021 Henan Large Bus
33,000units/year
  • Booth Exhaust VOC Treatment
  • Exhaust Air Treatment
2021 Hubei Passenger Car
200,000units/year
  • Booth Exhaust VOC Treatment
  • Exhaust Air Treatment
2021 Guangdong Passenger Car
200,000units/year
  • Sealer Automation
  • Working Area / Robot
2021 Hubei Passenger Car
180,000units/year
  • Booth exhaust VOC treatment
  • Exhaust Air Treatment
2020 Wuhan City, Hubei Passenger Car
240,000 unit/year
  • PA#2 B-Line
  • Base Outer Painting Robot Renewal
  • Robot / Paint Supply System /
2020 Wuhan City, Hubei Passenger Car
300,000 unit/year
  • Paint Quality Inspection & Automatic measurement Equipment /Robot /
2020 Guangzhou City, Guangdong Passenger Car
240,000 unit/year
  • Zengcheng PA#2
  • Intermediate Coating Robot Renewal
  • Robot / Paint Supply System /
2020 Guangzhou New Energy Vehicle
100,000 units/year, 2 shifts
  • Booth / Air-conditioning / Working Area / Fire Fighting System /
2019 Chengdu Passenger Car
25JPH
  • Booth / Air-conditioning
2019 Wuhan Passenger Car
52JPH
  • Booth / Air-conditioning / Robot /
2019 Wuhan Passenger Car
20JPH
  • Ovens / Booth / Air-conditioning / Working Area /Robot
2019 Guangzhou
Guangdong
Passenger Car
200,000 units/year
  • Booth/Oven/Work Area/Exhaust Air Treatment
2018 Dalian Passenger Car
60JPH
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System
2018 Guangzhou Passenger Car
60JPH
  • Exhaust Air Treatment
2018 Anhui
Hefei

Construction machinery
  • Booth / Air-conditioning / Exhaust Air Treatment
2018 Changzhou Passenger Car
  • Booth / Air-conditioning / Robot
2018 Wuhan Passenger Car
256000/year
  • Robot
2018 Guangzhou Passenger Car
240000/year
  • Robot
2018 Guangzhou Passenger Car
180000/year
  • Robot
2018 Guangzhou Passenger Car
180000/year
  • Robot
2018 Changzhou Passenger Car
156000/year
  • Robot
2018 Zhengzhou Passenger Car
180000/year
  • Robot
2018 Zhengzhou Passenger Car
135000/year
  • Robot
2018 Wuhan
Hubei
Passenger Car
300,000 units/year
  • Full Turn Key(Except for PCS and ROBOT)
2017 Tianjin Passenger Car
160,000 units/year 2shift
  • Water-borne Paint Robot Modification
  • Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System / Utility
2017 Guangzhou New Energy Vehicle
100,000 units/year 2shift
  • New Paint Shop
  • Ovens / Booth / Air-conditioning / Conveyor / Exhaust Air Treatment / Central Control System
2017 Fuzhou
Fujian
Passenger Car
50,000 units/year 2shift
  • Water-borne Paint Modification
  • Paint Supply System
2017 Wuhan
Hubei
Passenger Car
120,000 units/year
  • Paint Shop Expansion
  • Robot
2017 Wuhan
Hubei
Passenger Car
240,000 units/year
  • Robot Modification
  • Robot
2017 Nanjing
Jiangsu
Passenger Car
200,000 units/year 2shift
  • VOC Modification
  • Booth / Air-conditioning / Exhaust Air Treatment
2017 Xiangyang
Hubei
Passenger Car
180,000 units/year 2shift
  • Expansion
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System
2017 Zhengzhou
Henan
Passenger Car
240,000 units/year
  • 3C1B Modification
  • Robot
2017 Zhengzhou
Henan
Passenger Car
240,000 units/year
  • 3C1B Modification
  • Robot
2016 Guangzhou Passenger Car
100,000 units/year
  • Working Area
2016 Guangzhou Passenger Car
240,000 units/year
  • Robot Modification
2016 Zhejiang Passenger Car
200,000 units/year
  • New Paint Line
  • Ovens / Booth / Air-conditioning / Conveyor / Exhaust Air Treatment / Central Control System
2016 Shenyang Passenger Car
130,000 units/year
  • 3C1B modification
  • Booth / Robot
2016 Guangzhou Passenger Car
240,000 units/year
  • Robot Modification
2016 Tianjin Passenger Car
150,000 units/year
  • Waterborne modification
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Central Control System
2016 Guangzhou Bumper
150,000 units/year
  • Robot Modification
2016 Henan Passenger Car
280,000 units/year
  • Modification
  • Booth / Robot

India

This table can be scrolled horizontally
Construction date Location Items Facility usage
2023 Uttar Pradesh Vande Bharat Train Coach
1000 nos./Year
  • Infrastructure Requirement for Series Production of Train S
2023 Haryana Bumper
Bumper , Splash guard , Extension 280,000 vehicles/year
  • Painting Equipment B-Line
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Exhaust Air Treatment / Fire Fighting System
2023 Maharashtra Forklift
10,000 Unit / Year
  • New Liquid Painting Line For MHE
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Fire Fighting System / Central Control System
2023 Maharashtra Passenger Car
400,000 Unit / Year
  • PT-CED Conveyor Connectivity
  • Conveyor
2023 Maharashtra Passenger Car
180,000 Unit/ year
  • Primer & Clear Coat Painting Robot Replaceme
2022 Haryana Passenger Car
255,000 units/year
  • New Paint B Line Body Paint Project
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Exhaust Air Treatment / Fire Fighting System
2022 Hyderabad Train Wagon
1000Unit/Year
  • Wagon Repair Workshop
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Utility
2022 Vadodara Memu Coach
  • Expansion phase-II of Pratapnagar workshop
  • Working Area
2022 Bhubaneswar LHB Coaches
  • Composite Works at CRW
  • Mancheshwar
  • Working Area
2022 Andhra Pradesh Compressor
3,000,000 units/year
  • PT-ED Line For Compressor
  • Pretreatment / ED-Coat / Ovens / Working Area / Conveyor
2022 Punjab Tractor Chassis
70,000 Unit/year
  • Tractor Chassis Painting Facility
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Conveyor
2022 Pune Passenger Car
200,000 units/year
  • Trim 1 & Trim 2 Skillet Conveyor
  • Conveyor
2022 Pune Passenger Car
42,000 car sets/year
  • Oil Conservation Plant For 4W
  • Pretreatment / Ovens / Conveyor / Central Control System
2021 Maharashtra Passenger Car
200,000 units/year 3shifts
  • WBS & PBS Automated Storage Retrieval System Installation
  • Conveyor
2021 Maharashtra Passenger Car
200,000 units/year 3shifts
  • Capacity expansion
  • Pretreatment / Ovens / Booth
2019 Haryana Tractor
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor / Fire Fighting System / Central Control System / Utility /
2019 Madhya Pradesh Truck Cabin
  • Conveyor
2019 Haryana Railway
  • Ovens / Booth / Air-conditioning / Utility
2019 Maharashtra Railway
  • Ovens / Booth / Air-conditioning / Utility
2019 Haryana Parts
400,000 unit/Year
  • Ovens / Booth / Air-conditioning / Working Area / Fire Fighting System / Central Control System / Robot/ Paint Supply System
2019 Madhya Pradesh Tractor
Sheet metal
100,000 unit/Year
  • Pretreatment / ED-Coat / Ovens / Working Area / Conveyor / Utility /
2019 Tamil Nadu Parts
  • Ovens /Cardboad filter Booth / Air-conditioning / Working Area / Fire Fighting System / Paint Supply System
2018 Gujarat Passenger Car
250000
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine/ Robot
2018 Gujarat Passenger Car
250,000 body/Year
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Exhaust Air Treatment / Fire Fighting System /
2018 Tamil Nadu Elevator Parts
360,000 unit/Year
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Conveyor / Utility /
2018 Tamil Nadu Parts
50,000 unit/Year
  • Ovens / Booth / Air-conditioning / Working Area / Fire Fighting System /
2018 Gujarat Parts
  • Booth/ Oven/ Conveyor/ Air-conditioning/ Paint Supply System
2017 Gujarat Alloy Wheel
1,430,000 units/year
  • New Paint Shop for Alloy wheel
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Conveyor / Fire Fighting System / Utility
2017 Chennai
Tamil Nadu
Parts
875,400 hanger/year
  • Plastic Painting Line
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Conveyor / Fire Fighting System
2017 Chennai
Tamil Nadu
Motorcycle
700 nos/day
  • Robot Installation Phase1
  • Robot
2017 Gujarat Passenger Car
250,000 units/year
  • Robot Installation
  • Pretreatment / ED-Coat / Ovens / Booth / Robot
2017 Visakhapatnam Wagon
  • Periodic Over Haul
  • Ovens / Booth / Air-conditioning / Paint Supply System / Fire Fighting System / Utility / Building
2016 Gujarat Passenger Car
250,000 units/year
  • New Paint Line
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Exhaust Air Treatment / Fire Fighting System
2016 Bihar Diesel Locomotive
100 units/year
  • Paint Booth
  • Ovens / Booth / Air-conditioning

Southeast Asia

This table can be scrolled horizontally
Construction date Location Items Facility usage
2023 Thailand Motorcycle
100,000 units/year
  • New Painting Line (Solvent)
  • Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Fire Fighting System / Central Control System
2023 Indonesia Bed Frame
520HG/Day
  • New Painting Line
  • Pretreatment / ED-Coat / Ovens / Booth / Auto Spray Machine / Conveyor / Waste Water Treatment / Utility
2022 Thailand Motorcycle Parts
612Hanger/Day
  • New ABS Painting Line
  • Ovens / Booth / Robot / Paint Supply System / Conveyor
2022 Indonesia Passenger Car
200,000 units/year
  • New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Auto Spray Machine / Robot / Waste Water Treatment / Utility
2022 Indonesia A/C Parts
1,100,000 Unit/Year
  • New Powder Coat Line
  • Pretreatment / Ovens / Booth / Auto Spray Machine / Robot / Paint Supply System / Conveyor / Central Control System / Waste Water Treatment / Utility
2021 Thailand Motorcycle Parts
27.1sec/Hg
  • New PO1 Painting Line
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System
2021 Thailand Pickup Truck
180,000 units/year 2shift
  • GW Factory Capacity up
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System
2021 Malaysia Autos&Bumper
50,000 units/year 2shift
  • New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Fire Fighting System / Central Control System / Utility
2020 Cambodia Motorcycle (Honda)
200,000 units/year
  • Pretreatment / ED-Coat / Ovens / Conveyor
2020 Myanmar Passenger Car
50,000 units/year
  • Pretreatment / ED-Coat / Ovens / Conveyor
2019 Thailand TRUCK CAB
25,164Unit/Year
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor /
2019 Thailand METAL PARTS OF CONDENSING UNIT
566,500Hg/Year
  • Pretreatment / Ovens / Booth / Air-conditioning / Conveyor /
2019 Thailand THERMOS BOTTLE
3,240,000Pcs/Year
  • Ovens / Booth / Air-conditioning / Robot / Paint Supply System / Conveyor /
2018 Thailand FRAME FOR MOTORCYCLE
210sec/Hg
  • Pretreatment / Ovens / Booth / Air-conditioning / Conveyor / Waste Water Treatment /
2017 Thailand Motorcycle
  • New ED Line
  • Pretreatment / ED-Coat / Ovens / Air-conditioning / Working Area / Conveyor
2017 Thailand Plastic Prats
  • New Painting Line
  • Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor
2016 Thailand Passenger Car
15,000 units/year
  • New Paint Line
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Fire Fighting System / Central Control System / Waste Water Treatment
2016 Malaysia Passenger Car
50,000 units / year
  • New Paint Line
  • Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Exhaust Air Treatment
2016 Philppine Passenger Car
50,000 units/year
  • Modification
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Robot / Paint Supply System
2016 Thailand Farm Machinery
10,000 units/year
  • New Paint Line
  • Pretreatment / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor

Europe

This table can be scrolled horizontally
Construction date Location Items Facility usage
2023 Egypt Train Maintenance
  • Phase 1 project
  • Working Area
2023 Hungary Passenger Car
280,000 units/year
  • Under Body Coat Sealer Robot
  • Robot
2023 Hungary Bumper
280,000 units/year
  • Primer Robot Replacement
  • Robot
2016 Russia Passenger Car
22,000 units/year
  • New Paint Shop Project
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Fire Fighting System / Utility

South America

This table can be scrolled horizontally
Construction date Location Items Facility usage
2023 Mexico Truck Cabin
360 job/day
  • New Paint Line Full Turn Key Project
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Paint Supply System / Conveyor / Exhaust Air Treatment / Fire Fighting System / Central Control System / Utility / Build
2022 Mexico Passenger Car
  • Dolly Storage Expansion
  • Conveyor
2020 Mexico Truckbed
200,000/year
  • New Paint Shop
  • Pretreatment / ED-Coat /Ovens / Booth / Air-conditioning / Working Area / Exhaust Air Treatment / Paint Supply System / Conveyor
2020 Brazil Motorcycle
  • New ABS Line
2018 Mexico Passenger Car
100,000/year
  • Ovens / Booth / Air-conditioning / Working Area / Exhaust Air Treatment /
2016 Mexico Pick-up Trucks
70,000 units/year
  • Expansion
  • Pretreatment / ED-Coat / Ovens / Air-conditioning / Paint Supply System
2016 Brazil Passenger Car
108,000 units/year
  • Expansion
  • Ovens / Booth / Working Area
2016 Brazil Passenger Car
  • New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Robot / Paint Supply System / Conveyor / Exhaust Air Treatment / Fire Fighting System / Central Control System

Other

This table can be scrolled horizontally
Construction date Location Items Facility usage
2022 Korea EV
150,000 units/year
  • Modification for EV Production
  • Pretreatment / ED-Coat / Ovens / Booth / Air-conditioning / Working Area / Auto Spray Machine / Conveyor / Central Control System
2022 Korea Truck
100,000 units/year
  • Modification of Paint Working Area
  • Working Area
2022 Korea Vehicle
300,000 units/year
  • Modification of PT,ED
  • Pretreatment / ED-Coat
2020 Korea Passenger Car
100,000 units/year
  • Gwangju Global Motors New Paint Shop
  • Pretreatment / ED-Coat / Ovens / Working Area / Exhaust Air Treatment / Utility /
2019 Taiwan Passenger Car
40,000 units/year
  • S/B
  • Pretreatment / ED-Coat / Ovens / Conveyor